Numéro |
J. Phys. IV France
Volume 133, June 2006
|
|
---|---|---|
Page(s) | 607 - 614 | |
DOI | https://doi.org/10.1051/jp4:2006133121 | |
Publié en ligne | 16 juin 2006 |
Inertial Fusion Sciences and Applications 2005
J.-C. Gauthier, et al.
J. Phys. IV France 133 (2006) 607-614
DOI: 10.1051/jp4:2006133121
Research Center of Laser Fusion, China Academy of Engineering and Physics, Mailbox 919-988, Mianyang, Sichuan 621900, China
© EDP Sciences 2006
J.-C. Gauthier, et al.
J. Phys. IV France 133 (2006) 607-614
DOI: 10.1051/jp4:2006133121
Performance of the first beam on Shenguang III technical Integration Line
Wanguo Zheng, Xiaomin Zhang, Xiaofeng Wei, Feng Jing, Zhan Sui, Jinqing Su, Mingzhong Li, Zhitao Peng, Shaobo He, Bo Chen, Xiaodong Jiang, Chi Ma, Dongxia Wu, Liangfeng Guo, Lei Ding, Xiongjun Zhang, Kuixin Zheng, Haien He, Weibao Liu, Xiaoyu Yang, Dianyuan Fan and Weiyan ZhangResearch Center of Laser Fusion, China Academy of Engineering and Physics, Mailbox 919-988, Mianyang, Sichuan 621900, China
Abstract
Technical Integration Line (TIL), which is being
constructed at CAEP, is the prototype of Shenguang III fusion laser
facility. Experimental results during the first integrated tests on the
first line demonstrate that the laser system architecture from master
oscillator through the laser amplifiers can meet the requirement of TIL
engineering design. In this paper, brief introduction of TIL and main
experiment results are presented.
© EDP Sciences 2006